Description
Installation precautions:
1. The NXQ-AB-80/10-L accumulator should be installed in a convenient location for inspection and maintenance.
2. When used to absorb shock and pulsation, the energy accumulator should be close to the vibration source and installed in a location prone to shock.
3. The installation position should be away from heat sources to prevent system pressure from increasing due to gas expansion due to heating.
4. Fixation should be firm, not allowed to be welded to the host, and should be firmly supported on the bracket or wall surface.
Tersedia juga model lain.
Silahkan chat/WA ke no 0858-7630-0414 (Fast respon)



